Moove Gestão
Phase 7 · Planning and analysis
Step 5 of 7
10 min
Beginner

BSC indicators, targets and measurements

Purpose

Define the indicator rule and check measurements; the status light is calculated, not set manually.

Before you start

Step by step

  1. 1

    Open the BSC objective/breakdown and the available indicator settings.

  2. 2

    Enter the fields required for the indicator, unit, target and tracking rule.

  3. 3

    Check the polarity and settings offered before saving.

  4. 4

    Record/check measurements for the right period with your permission.

  5. 5

    Status is calculated by the indicator rules; do not automatically assume green at 100% or red below 90% for every case.

  6. 6

    When changing a target or rule, assess comparability with earlier measurements and check the result.

  7. 7

    BSC indicators and the CRM Goals area are not one universal Goals → Indicators screen.

Access and availability

Available controls depend on your user permissions and organization settings. If an option is missing, ask the administrator to check your module access.

Pronto para organizar sua gestão em um só lugar?

Teste grátis por 7 dias, sem cartão, ou fale agora com um especialista.

WhatsApp (61) 98144-3333